Wednesday, October 14, 2015

Sun Deck Restoration in Richmond

home-restoration-covered-patio_11

home-restoration-covered-patio_12

Top To Bottom Construction was called out to transform this homeowner’s sun deck into a workout room.

There were many problems with the current covered deck.

Originally they had carpet that was molding and rotting from the underlay.  Moisture and rain was coming in from two openings on either side of the window in the middle.

All the carpet and mold was removed and cleaned up.  The flooring was rejuvenated with a fresh coat of grey paint and an added slip-resistant finish to it, which works well for a workout room.

To cover up the two openings, preventing any further mold and rot, TTBC added two windows to fully enclose the deck.

The interior and exterior walls were repainted a clean white.

New gutters were added to properly direct rainfall, extending the longevity of the exterior wall and paint.

 

More photos from the project:

Before
Before
Before
After
Before
Before
After
After
Before
After

PROJECT DETAILS

  • Moldy rotten carpet was removed and floor was repainted.
  • Installed two new windows to fully enclose deck.
  • Interior and exterior walls repainted.
  • Gutter installed to protect walls and paint.

The post Sun Deck Restoration in Richmond appeared first on Top To Bottom Construction.




from WordPress https://ttbcca.wordpress.com/2015/10/14/sun-deck-restoration-in-richmond/

Exterior Skylight Restoration

Before

After

This homeowner had the leak on going in the skylight above the home’s front entrance door for about 3 years.

As you can see from the before pictures, the wood was already rotting and mold started to build inside. It may seem to be a small matter but it had to be addressed asap or else the water could have gone through the exterior walls and potentially make it through the drywall inside causing more damages.

The team at Top To Bottom Construction sealed the primary source of the water where it was coming from and restored the rotten/moldy wood.

The homeowner was pleased with TTBC and also had us shift the domed skylight forward to provide coverage for their front entrance.

With the leak fixed and the skylight restored, everything now looks and functions as good as new.

More photos from the project:

Before
Before
After

PROJECT DETAILS

  • Skylight over front entrance was leaking for about 3 years
  • Skylight frame was rotting and moldy.
  • Leak was fixed at the source
  • Skylight and frame were restored.
  • Skylight was shifted forward for better coverage of front door

The post Exterior Skylight Restoration appeared first on Top To Bottom Construction.




from WordPress https://ttbcca.wordpress.com/2015/10/14/exterior-skylight-restoration/

Foyer Expansion at Richmond Pro Badminton

Thursday, September 17, 2015

Laminate Wood Flooring Installation

wood-flooring-installation_01

wood-flooring-installation_02

This homeowner had carpet throughout the second floor of his house and wanted to replace the carpet with laminate wood flooring for a warmer and cleaner look that is also easier to maintain. All the old carpet was pulled up and disposed of. The new flooring was installed with new baseboards and finished promptly after to minimize any disturbance to the home owner’s daily activities. The homeowners were very pleased with our work and had this to say as a testimonial:

“From start to finish we were very impressed with how Matthew and his team quickly completed the installation of our new laminate floor throughout the upstairs of our home. They worked effectively and efficiently to complete the job in half the time we had anticipated. Once done, they cleaned everything up, returned the furniture and left with everything looking AMAZING! We would definitely recommend Top to Bottom Construction and would welcome them back to our home for future renovation projects.
Thanks for a job well done guys, and for the handyman repairs to our door and hardware– for free :)”
Liesa and Dave

More project photos below:

before
after
before
after

PROJECT DETAILS

  • old carpet throughout home removed and disposed
  • baseboards re-installed
  • new laminate wood flooring installed throughout third floor of home

The post Laminate Wood Flooring Installation appeared first on Top To Bottom Construction.