Tuesday, April 26, 2016

Bathroom Renovation in Richmond

BEFORE:
bathroom remodeling before

AFTER:
bathroom renovations vancouver completed

Top to Bottom Construction was called out to do some bathroom renovations at a 3 story townhouse located near the Terra Nova area in Richmond.

The homeowner wanted to remodel the bathtub on the 3rd floor into a shower stall with a seat.

The bathtub was never being used and it was urgent that the unnecessary bathtub be removed. We came in about a week after we inspected it and also had it done in about a week.

The bathroom being on the third level, we made sure that their stair carpet was kept clean during this process because we had lot of foot traffic going in and out of the townhome, as because material were brought in and out, and tiles needed to cut the tiles outside.

After the original tiling and bathtub were stripped out, the plumbing and electrical were upgraded to prevent any leaking.  A new high quality shower head and tiling were completed after the new drywall was put up.

We kept the seat near the window for extra storage and for the homeowner to sit on while bathing.

Grab bars were added for easier access to the shower as well as a sliding glass door for a more modern look and to make the area look bigger.

More photos from the project:

Floor cover to keep the home clean

Floor cover to keep the home clean

Floor cover to keep the home clean

Floor cover to keep the home clean

Drop cloth on staircase to keep the home clean

Floor cover to keep the home clean

Bathroom remodel work in progress

New plumbing and electrical

New bathtub plumbing to prevent leaks

New bathtub plumbing to prevent leaks

Drywall and shower floor added

Widow with finished tiling work

Detail close-up of shower tiles

New showerhead and hand rail grab bar

PROJECT DETAILS

  • Old bathtub converted to new shower stall
  • New exhaust fan added
  • Tiles surrounding the circular window
  • New plumbing and electrical
  • New high quality shower head fixture
  • New sliding glass door and grab bars for easy access and safety.

The post Bathroom Renovation in Richmond appeared first on Top To Bottom Construction.




from WordPress https://ttbcca.wordpress.com/2016/04/26/bathroom-renovation-in-richmond/

Saturday, April 16, 2016

Laundry Room Remodel

TTBC had finished renovating the washrooms throughout this home in Richmond, but the renovations requested by the home owner did not stop there.

The laundry room needed to be remodeled to make it more convenient for them to fold their clothes and have more storage room. To make it easier on their backs, we raised their washer and dryer onto a platform. This meant no more bending down and no more back pain!

We added a back-splash around the sink to prevent water from getting through the walls. This was important because they regularly bathed their dog in this sink. We added high gloss cabinets along the wall for more storage space and added under-cabinet LED lighting. We also made the room brighter by adding recessed pot lights in the ceiling.

All in all, the project was fully completed in one and about 10 days.

More photos from the project:




PROJECT DETAILS

  • washer and dryer raised to allow for easier access and reduced back strain.
  • back-splash added around sink to keep the walls protected.
  • more storage added with high gloss cabinets along the wall.
  • under-cabinet LED lighting
  • recessed pot lights
  • quartz counter-top
  • new plumbing and electrical

The post Laundry Room Remodel appeared first on Top To Bottom Construction.




from WordPress https://ttbcca.wordpress.com/2016/04/17/laundry-room-remodel/